- The work of the presidential initiative for 7 villages in the Balina center, Sohag governorate, for a decent life project (descent networks - lifting and ejection stations) engineering authority of the Armed Forces in the southern region contract value of 600,000,000 L.E.
- Dredging and purification of the accumulated sediments at Al-Lanchat Port in Sidi Kerir for SUMED Company, contract No. 55/2020 contract value of 22,512,000 L.E.
- Removing the navigational bottlenecks in the Elryah El-Bahairi in the distance from 42 km to 82 km (Al-Khattabah Lock - Pauline Barrages the Public Authority for River transport contract value of 79,167,000 L.E.
- Supply and installation of 408 irrigation units in Wadi Sa’ida for the General Authority for Construction Projects and Agricultural Development contract value of 8.725.000 L.E.
2022
-Project of replacing and renovating the Tama Al-Marg sewage lifting station - Deyarb Negm branch for the benefit of the Drinking Water and Wastewater Company in Sharkia contract value of 948,100 L.E.
-The process of removing navigational bottlenecks in Aswan Governorate (different places) destiny from km 8 to km 169 for the General Authority for River Transport contract value of 12.950.000 L.E.
-Maintenance of gates, switches and shutters in the Department of Maritime Irrigation in Beni Suef for the fiscal year 2021/2022 - 2022/2023 for the General Administration of Irrigation of Beni Suef - Ministry of Water Resources and Irrigation contract value of 1.052.000 L.E.
-The process of maintaining gates, switches, and in take in the administration department of tribal irrigation, Beni Suef, for the fiscal year 2021/2022 - 2022/2023 for the General Administration of Irrigation of Beni Suef - Ministry of Water Resources and Irrigation contract value of 1.340.000 L.E.
-The process of removing navigational bottlenecks in the Nile River in Aswan Governorate, at a distance from 8 km to 169 km (different places) for the General Authority for River Transport contract value of 17.188.000 L.E.
-The process of rehabilitating and lining the Castle Canal from km 24.1 to the end of km 30, with a length of 5.9 km, under the authority of the General Administration of Aswan Irrigation for the Ministry of Water Resources and Irrigation / General Administration of Irrigation of Aswan Governorate contract value of 26.993.000 L.E.
2023
-Works to raise the efficiency of buildings, chalets and the commercial market in the village of dreams at kilo 92, North Coast for the benefit of the Workers Establishment for Resorts Services owned by the General Federation of Egyptian Trade Unions contract value of 4.500.000 L.E.
-The process of dredging and protecting the sides of the Nubariya Canal from km 14 to km 28.5 for the General Authority for River Transport contract value of 201.239.000 L.E.