The project of operating and maintaining equipment for the Egyptian Ugandan project for resisting water weeds, building dams for harvesting rain water, river beaches and fish ports, and completing the Masisi beach in Uganda has been completed, as the project was delivered on 6/7/2019.
- Operation and maintenance of the equipment. |
- for weed Control Project in Uganda. |
- Dredging works at kuga canal. |
- Weed removal from( Victoria-Albert-Kuga)lakes. |
- Weed removal from Kagira river. |