Project of supplying Wadi Zikir farms with the great river water
Wadi Zokair agricultural project near the city of Sirte includes a main pipeline of GRP length of 10900 m with diameters of 500 and 600 mm and pipelines of UPVC with a length of 18700 m. With different diameters and road network and 166 concrete tank capacity of 46 m 3 as well as power line 11 K F. Components of the project: Preparing drawings for the entire project (water lines, farm tanks, road networks, electricity, etc.). The earthworks of the distribution line include digging and trenching and trenching sand bottom pipe. The main and subsidiary pipeline works, including the hydrostatic tests of G.R.P and U.P.V.C of the type of coupling with supplements, stabilizers, connectors, reducers, alkali, different diameters and different operating pressures. The air-cleaning and washing rooms and the rear pressure control valves, including the valves, valves and connecting parts. Construction of concrete blocks for reagents, reducers and compartments. Construction of farm tanks including settlement works, drilling, reclamation, concrete works, metal works, supplements, supply, installation, testing and testing of pipes, taps and buoys, and implementation of the buoyancy buildup and the protection of the reservoirs. The work of the main and sub-road network, including drilling, embankment, auxiliary foundation layer, granular base layer, M.C.O layer, and asphalt layer. The electricity network works to feed farms.
|
|