the Company owns a large fleet of dredging equipment used for construction , widening & cleaning of Canals & water streams.
- Cleaning, deepening & widening Nobaria canal.
- Dredging open lakes at marina touristic village.
- Deepening & improving Damaitte navigational branch.
- Completion of the dredging of the southeastern area of Bougaz, El Dibh Triangle, within the second stage of the urgent solution for developing Al-Manzala Lake, the southern part from 3,500 km to 7,300 km.
- Sidi Kerir dredging work for Sumed Company (dredging and clearing the accumulated sediments). Contract extended from 2018 to 2021.
![]() |
![]() |
![]() |
![]() |