• Tawergha reclamation project. • Bengawad dam project. • Terffas well project. • Wadi Caam dam project. • Improvement of Sultan farms project - sert. • Providing Waadi AZKIR farms with water – Great Artificial River. • The process of tourists (Mediterranean company 5%). • The process of concrete blocks in the Seleuk region. • Operation of the Gulf farm (the great man-made river system). • A process of tourists and led to sleep (Gulf Engineering Construction and Contracting). |